RPRC’s venerable switchers are paired up again today to bring cuts of coal hoppers back to the UP collection point near Central Ave. After switching out the bad order cars at the 23rd Ave Yard, the units dragged the first cut of fifty cars out to the UP tracks. The train swung north on the Stege wye and are seen here grinding up the Waterside drill past the Cutting Blvd grade crossing.
The UP has a block signal bridge on the far side of the grade crossing but the Waterside track has no signal so the RPRC can chug on through.